色呦呦网址在线观看,久久久久久久久福利精品,国产欧美1区2区3区,国产日韩av一区二区在线

掌握十年的CNC加工經驗!

在模具廠,CNC加工中心主要用于模芯、鑲件等模具關鍵零件,以及銅件等加工。模具和鑲件的質量直接決定了模具成型件的質量。銅加工的質量直接限制了電火花加工的影響。 CNC加工質量的保證,關鍵在于加工前的準備工作。除了要有豐富的加工經驗和模具知識外,還要注意良好的溝通,尤其是與生產團隊和同事的溝通。

CNC machining process

1) Reading drawings and procedures

2) Transfer the corresponding program to the machine

3) Check the program head, cutting parameters, etc.

4) Determination of process size and margin on the workpiece

5) Reasonable clamping of the workpiece

6) Accurate alignment of the workpiece

7) Accurate establishment of workpiece coordinates

8) Selection of reasonable tools and cutting parameters

9) Reasonable clamping of the tool

10) Safe trial cutting method

11) Observation of the processing process

12) Adjustment of cutting parameters

13) Problems in the process and timely feedback from the corresponding personnel

14) Detection of workpiece quality after machining

Precautions before processing

1) For the new model, the processing map should meet the requirements, and the data is clear; the processing map of the new model must have the signature of the supervisor, and the columns of the processing map are filled out.

2) The workpiece has a qualified mark for the quality department.

3) After receiving the program list, check whether the workpiece reference position is consistent with the drawing reference position.

4) Look at each requirement on the program sheet to confirm that the program and drawing requirements are consistent. If there is a problem, you must solve the problem together with the programmer and the production team.

5) According to the material of the workpiece and its size, judge the rationality of the tool used by the programmer to open the rough or light knife program.

If the tool is found to be unreasonable, the programmer should be notified immediately to make changes to improve machining efficiency and workpiece machining accuracy.

Precautions for clamping workpieces

1) When clamping the workpiece, pay attention to the position of the pallet and the extension length of the nut-bolt on the pressure plate. In addition, the screw cannot be bottomed when the angle is locked.

2) Tonggong is generally used for lock plate processing. Before the machine is installed, it should be checked against the number of materials on the program sheet. At the same time, check whether the closing screw is tightened.

3) For the case where a board receives multiple pieces of copper material, check whether the direction is correct and whether the copper materials interfere during processing.

4) According to the shape of the program sheet and the data of the workpiece size, it is necessary to note that the workpiece size data is written as XxYxZ. At the same time, if there is a piece map, the graphics of the program sheet and the figure of the parts drawing must be checked. Whether it is consistent, pay attention to which direction to go out, and the X, Y axis of the pendulum.

5) When clamping the workpiece, it is necessary to check whether the workpiece size meets the size requirements of the program sheet. If there is a part drawing, it is necessary to check whether the size of the program sheet is the same as the size of the parts drawing.

6) The workbench and the bottom of the workpiece should be cleaned before the workpiece is placed on the machine. Apply the oil stone on the machine table and the workpiece surface to push off the burrs and the damaged position.

7) When the code is coded, make sure the chip is not damaged by the knife and communicate with the programmer if necessary. At the same time, if the bottom pad is square, the code must be aligned with the square of the pad to achieve the purpose of force balance.

8) When using a vise clamp, you must know the depth of the tool to prevent it from being too long or too short.

9) Screws must be included in the T-shaped block. Do not use only a part of the thread. If the screw is to be connected, the upper and lower screws must use the thread of the half joint. The thread of the nut on the pressure plate must be completely used. Thread.

10) When determining the Z depth number, you should see the position of the program single touch number and the data of the highest point of Z. After inputting the data into the machine tool, you must check it again.

Precautions for clamping tools

1) It must be firmly clamped and not too short in the handle.

2) Before each shovel, check whether the tool meets the requirements. The length of the knives should be determined according to the machining depth indicated by the program. Generally, it should be slightly longer than the machining depth value of 2mm and the shank should be considered.

3) If you encounter a deep processing depth, you can communicate with the programmer. If you want to use the knife twice, you should first obtain half the length of 2/3, and then wait longer when you process to a deeper position. This can improve processing efficiency.

4) When using the extension cord, you should especially know the depth of the lower knife and the required length of the knife.

5) Before the cutter head is installed on the machine, its taper fit position is cleaned with a cleaning cloth, and the corresponding position of the machine tool sleeve is also cleaned to avoid the iron filings on the mating surface affecting the accuracy and damage the machine tool.

6) Generally, the tool length is used for the tool length (in the case of the knife in the special case), the program order should be checked carefully.

7) When the program is interrupted or repaired, it is necessary to pay attention to whether the depth can be connected with the front. Under normal circumstances, the line can be adjusted upward by 0.1mm, and then adjusted according to the situation.

8) Rotating and removing the cutter head. If water-soluble cutting fluid is used, it should be immersed in lubricating oil for several hours every half month for maintenance, so that the internal parts of the cutter head can be lubricated without wear.

Precautions for correcting the alignment of the workpiece

1) When the workpiece is towed, you must pay attention to the verticality, while dragging, and then dragging the vertical edge.

2) When the workpiece is divided, it must be verified twice.

3) After the number of hits, the median size should be provided according to the program and the size on the parts map should be checked.

4) All workpieces must be divided into sub-centers. The zero position must be divided into the sub-centers and then moved to the side. It must be ensured that the balances on both sides are consistent. If a special case must be taken unilaterally, it must be confirmed by the production team before it can pass. After the unilateral number is taken, remember the radius of the rod in the compensation back.

5) The zero input of the workpiece center must be the same as the three-axis center of the workstation computer diagram.

Processing considerations

1) When the amount of the top surface of the workpiece is too large, use a large knife to manually remove the remaining amount, and remember not to be deep.

2) The most important processing is the first knife. If you carefully operate and check, you can know whether the tool length compensation, tool radius compensation, program, speed, etc. are wrong, to avoid damage to the workpiece, tool, and machine tool.

3) Trial the procedure as follows:

a) The height of the first point is up to 100mm, and it is correct to use the eye to feel it;

b) control “quick shift” to 25% and feed to 0%;

c) When the tool approaches (about 10mm) the working surface, the machine is suspended;

d) check the remaining stroke and the program is correct;

e) After turning on the power again, put one hand on the pause,, ready to stop at any time, and the other hand controls the feed speed;

f) When the tool is very close to the workpiece surface, it can be stopped again. The remaining stroke of the Z-axis must be checked.

g) After the machining is smooth and stable, return the control to the normal state.

4) After entering the program name, use the pen to copy the name of the program on the screen, and then check with the program. When opening the program, check whether the size of the tool in the program matches the program list, and sign the processor on the program. Fill in the file name and the size of the tool in the column, and do not fill it in afterward or beforehand.

5) In principle, the NC mechanic must not leave when the workpiece is roughed. If you need to change the knife or assist in adjusting other machine tools, you must ask other NC team members or check back regularly.

6) When doing medium light, the NC mechanic should pay special attention to the place where the opening is not open when the thickening is made to prevent the tool from hitting this area.

7) Program cutting. If the program breaks during processing and wastes too much time from the beginning, the team leader and the programmer should be notified to modify the program and cut off the part that has been done.

8) The program is abnormal. If the program has a different situation and is not sure, you can hang up to observe the process and then decide the next action.

9) The speed and speed provided by the programmer during the machining process can be adjusted by the NC mechanic as appropriate. However, special attention should be paid to the fact that small pieces of copper cannot be opened at a high speed to avoid loosening of the workpiece due to shock.

10) During the machining of the workpiece, the NC mechanic should check with the parts drawing to see if there is any abnormal condition. Once the two are found to be inconsistent, the team leader must be immediately shut down to check whether there is any error.

11) When using a tool with a length of more than 200mm, it is necessary to pay attention to the margin and the depth of the feed, the speed of the feed, etc., in order to avoid the knives, and the speed of the corner should be controlled.

12) The operator must be responsible for detecting the diameter of the tool on the program sheet. At the same time, the diameter of the test shall be recorded. If the tolerance is exceeded, it shall be immediately reported to the team leader or the tool change.

13) When the machine tool is in automatic operation or available, the operator should go to the workstation to learn about the remaining machining programming, prepare and grind the appropriate tool for the next machining standby to avoid downtime.

14) Process errors are the main reasons for wasting time: incorrect use of improper tools, processing errors, waste of time in locations where no machining or non-computer processing is required, improper use of machining conditions (slow speed, empty knife), the knife path is too dense, the feed is too slow, etc.), the above events can be contacted during programming.

15) During the machining process, attention must be paid to the wear of the tool. The blade or tool should be replaced appropriately. After replacing the blade, pay attention to whether the boundary of the machining is consistent.

Processing precautions

1) Confirm that each procedure and each instruction required by the procedure has been completed.

2) After the processing is completed, it is necessary to check whether the shape of the workpiece meets the requirements, and at the same time, the workpiece size self-test is performed according to the part drawing or the process drawing, and the error is found in time.

3) Check the position of the workpiece for any abnormality. If in doubt, notify the NC team leader.

4) The large group of workpieces must be notified to the team leader, programmer and production team leader.

5) Pay attention to safety when the workpiece is off the machine, especially when the workpiece is off the machine, the workpiece and the NC machine should be protected.

Ten years of mastering CNC machining experience collection!Just get it! 2

Different treatments of processing accuracy requirements

The surface quality of polished light:

1) mold core, insert

2) Tonggong

3) thimble plate support hole and other places to avoid vacancies

4) Eliminate the vibration of the knife

The size of the fine light:

1) Measurable size must be strictly performed after processing self-test

2) Consider the loss of the tool during long-term processing, especially the sealing position.

3) The fine light should use new cemented carbide tools as much as possible

4) Determine the modulus of the lens after finishing the light according to the processing requirements

5) Confirmation of quality after processing and quality

6) Control the tool loss during the processing of the sealant depending on the processing requirements

Hand over

1) Confirm the operation of the work, including the processing situation, mold conditions, etc.

2) Confirm that the working equipment of the shift is normal.

3) Other handovers and confirmations, including drawings, program sheets, tools, gauges, fixtures, etc.

Workplace finishing

1) Execute according to 5S requirements.

2) The tools, measuring tools, fixtures, workpieces, tools, etc. are placed neatly.

3) Cleaning of the machine tool.

4) Cleaning the workplace floor.

5) Returning the processed tool, idle tool and measuring tool.

6) The processed parts are sent to the product inspection or the corresponding department.

發(fā)表評論

電子郵件地址不會被公開。 必填項已用*標注

麻豆免费播放在线观看-在线观看成人午夜福利-亚洲华人在线免费视频-国产极品超大美女白嫩在线| 高清国产av一二三四-少妇激情高潮视频网站-被公么玩弄邻居人妻中文字幕-亚洲免费成人av在线| 国产成人自拍视频精品-丝袜美腿亚洲一区二区刘亦菲-91精选国产在线视频-欧洲美熟女乱又伦免费| 一区二区三区日本在线播放-男人的天堂亚洲最新在线-各类女厕正面偷拍精品-91精品蜜臀国产自产| 国产精品一二三四区无线乱码-精品亚洲国产成人精品-国产精品蜜桃一区二区三区-黄片av在线免费播放| 悠悠成人资源亚洲一区二区-国产成人综合亚洲国产-青青草在线公开免费视频-91精品日本在线视频| 四虎最新在线观看视频-水蜜桃一二二视频在线观看免费-一区二区精品在线观看视频-成人高清在线播放视频| 国产视色精品亚洲一区二区-激情艺术中心国产精品-国产农村一级特黄真人片-免费观看午夜视频在线| 成人深夜视频免费在线观看-国产极品裸体av在线激情网-欧美色区国产日韩亚洲区-中文字幕番号免费观看| 日韩国产自拍在线视频-亚洲av午夜激情在线播放-午夜福利你懂的在线观看-少妇特殊按摩高潮惨叫| 国产精品18禁免费无摭挡-国产精品久久久看三级-国产亚洲精品熟女国产成人-国产亚洲精品不卡中文| 欧美亚洲午夜综合一区二区-亚洲大香蕉视频在线观看-国产综合激情人妻91麻豆-国产精品国产三级国产专不| 国内自拍偷拍视频91-日本成人熟女一区二区三区-国产l精品国产亚洲区久久-久久精品成人中文字幕| 加勒比大香蕉优优久久-国产av精品国语对白国产-亚洲一区二区免费日韩-国产一级内射无挡观看| 久久噜噜噜精品国产亚洲综合-91精品国产高清久久福利-精品国产一区二区三区麻豆-日本加勒比一区二区在线观看免费| 91高清精品一区在线观看-成人黄色大片免费网站-国产成人综合亚洲另类-气质女人呻吟内射在线观看| 日韩亚洲高清在线一区二区三区-国产无遮挡爆操美女老板-伊人久久亚洲精品国产av-国产亚洲综合成人在线| 国产日本高清一区二区三区-久久亚洲成人精品性色-九九热99这里只有精品-亚洲愉拍自拍另类天堂| 国产精品人成在线播放蜜臀-老司机午夜福利视频在线-亚洲激情av免费观看-国产情侣91在线观看| 蜜臀网站视频在线播放-四虎午夜福利视频在线观看-黄色国产精品福利刺激午夜片-亚洲精品国产成人av| 午夜精品久久内射电影-亚洲精品自拍视频免费在线-国产免费观看久久黄av麻豆-麻豆国产精品伦理视频| 日本av自拍偷拍视频-日韩精品人妻一区二区三区-看片福利国产午夜三级看片-在线观看视频最新信息好幫手| 91九色中文在线播放-日韩中文字幕熟女人妻-成人黄色一级在线观看-日本一区二区三区视频在线| 精品淑女少妇av久久免费-欧美激情亚洲精品一区-九九热在线视频观看精品-亚洲天堂激情av在线| 亚洲少妇熟女一区二区三区-熟女熟妇少妇妇女乱熟-一区二区三区不卡国产视频-成人精品一区二区三区综合| 日本一区二区三区高清视频-九九九热在线观看视频-亚洲综合自拍偷拍人妻丝袜-亚洲精品国产二区三区在线| 少妇人妻午夜精品视频-亚洲乱妇老熟女爽到潮的片-最新国产黄色一区二区-亚洲一区国产精品喷潮| 精品女同一区二区免费播放-四虎成人精品国产永久免费-日韩在线播放av不卡一区二区-久热久草香蕉在线视频| 国产老熟女精品一区二区三区-精品国精品自拍自在线-亚洲国内自拍愉拍少妇-欧美日韩一级片免费播放| 2023年久久国产精品-亚洲中文字幕二区在线观看-人人妻人人玩人人澡人九色-午夜精品福利视频网站| 大奶人妻丝袜中出在线-亚洲一区久久中文字幕-国产成人av剧情自拍网站-嫩草伊人久久精品少妇av| 91免费视频完整版高清-久久青草国产日韩资源-黄色激情网站免费提供-国产精品麻豆三级一区视频| 色婷婷av一区二区三区网-日韩在线不卡一二视频-中文字幕乱码免费在线视频-黄片欧美免费在线观看| 九九热在线视频中文字幕-午夜激情在线观看不卡-国产精彩激情视频在线观看-人妻丰满熟妇九九久久| 最新国产av在线播放-成人av免费观看黄色-中文字幕人妻av一区二区风险-亚洲av午夜精品福少妇喷水| 人妻少妇精品久久中文字幕-在线免费观看亚洲小视频-网友偷拍视频一区二区三区-亚洲国产精品日韩av在线| 天堂国产精品一区二区三区-亚洲欧美日韩国产精品久久-av毛片黄片在线观看-尤物国产视频在线观看| 国产成人啪午夜精品网站-国产乱码精品一区二区三区-男人天堂网av一区二区三区四区-亚洲第一区二区精品三区在线| 亚洲av乱码久久观看-亚洲爆码一区二区三区-91亚洲国产精品视频-黑丝美女被爆操流白浆| 九九九热在线免费观看-亚洲午夜理论片在线观看-欧美日韩亚洲国产第一-国产高清一区二区av在线| 午夜福利网午夜福利网-国产粉嫩学生在线观看-亚洲精品成人高清在线观看-亚洲人成人日韩中文字幕|