色呦呦网址在线观看,久久久久久久久福利精品,国产欧美1区2区3区,国产日韩av一区二区在线

Ten years of mastering CNC machining experience collection!Just get it!

In the mold factory, the CNC machining center is mainly used for mold key parts such as mold cores and inserts, and copper and other processing. The quality of the mold and the insert directly determines the quality of the molded part of the mold. The quality of copper processing directly limits the impact of EDM processing. For the guarantee of CNC processing quality, the key lies in the preparation before processing. In addition to having rich processing experience and mold knowledge, we must pay attention to good communication, especially communication with the production team and colleagues.

CNC machining process

1) Reading drawings and procedures

2) Transfer the corresponding program to the machine

3) Check the program head, cutting parameters, etc.

4) Determination of process size and margin on the workpiece

5) Reasonable clamping of the workpiece

6) Accurate alignment of the workpiece

7) Accurate establishment of workpiece coordinates

8) Selection of reasonable tools and cutting parameters

9) Reasonable clamping of the tool

10) Safe trial cutting method

11) Observation of the processing process

12) Adjustment of cutting parameters

13) Problems in the process and timely feedback from the corresponding personnel

14) Detection of workpiece quality after machining

Precautions before processing

1) For the new model, the processing map should meet the requirements, and the data is clear; the processing map of the new model must have the signature of the supervisor, and the columns of the processing map are filled out.

2) The workpiece has a qualified mark for the quality department.

3) After receiving the program list, check whether the workpiece reference position is consistent with the drawing reference position.

4) Look at each requirement on the program sheet to confirm that the program and drawing requirements are consistent. If there is a problem, you must solve the problem together with the programmer and the production team.

5) According to the material of the workpiece and its size, judge the rationality of the tool used by the programmer to open the rough or light knife program.

If the tool is found to be unreasonable, the programmer should be notified immediately to make changes to improve machining efficiency and workpiece machining accuracy.

Precautions for clamping workpieces

1) When clamping the workpiece, pay attention to the position of the pallet and the extension length of the nut-bolt on the pressure plate. In addition, the screw cannot be bottomed when the angle is locked.

2) Tonggong is generally used for lock plate processing. Before the machine is installed, it should be checked against the number of materials on the program sheet. At the same time, check whether the closing screw is tightened.

3) For the case where a board receives multiple pieces of copper material, check whether the direction is correct and whether the copper materials interfere during processing.

4) According to the shape of the program sheet and the data of the workpiece size, it is necessary to note that the workpiece size data is written as XxYxZ. At the same time, if there is a piece map, the graphics of the program sheet and the figure of the parts drawing must be checked. Whether it is consistent, pay attention to which direction to go out, and the X, Y axis of the pendulum.

5) When clamping the workpiece, it is necessary to check whether the workpiece size meets the size requirements of the program sheet. If there is a part drawing, it is necessary to check whether the size of the program sheet is the same as the size of the parts drawing.

6) The workbench and the bottom of the workpiece should be cleaned before the workpiece is placed on the machine. Apply the oil stone on the machine table and the workpiece surface to push off the burrs and the damaged position.

7) When the code is coded, make sure the chip is not damaged by the knife and communicate with the programmer if necessary. At the same time, if the bottom pad is square, the code must be aligned with the square of the pad to achieve the purpose of force balance.

8) When using a vise clamp, you must know the depth of the tool to prevent it from being too long or too short.

9) Screws must be included in the T-shaped block. Do not use only a part of the thread. If the screw is to be connected, the upper and lower screws must use the thread of the half joint. The thread of the nut on the pressure plate must be completely used. Thread.

10) When determining the Z depth number, you should see the position of the program single touch number and the data of the highest point of Z. After inputting the data into the machine tool, you must check it again.

Precautions for clamping tools

1) It must be firmly clamped and not too short in the handle.

2) Before each shovel, check whether the tool meets the requirements. The length of the knives should be determined according to the machining depth indicated by the program. Generally, it should be slightly longer than the machining depth value of 2mm and the shank should be considered.

3) If you encounter a deep processing depth, you can communicate with the programmer. If you want to use the knife twice, you should first obtain half the length of 2/3, and then wait longer when you process to a deeper position. This can improve processing efficiency.

4) When using the extension cord, you should especially know the depth of the lower knife and the required length of the knife.

5) Before the cutter head is installed on the machine, its taper fit position is cleaned with a cleaning cloth, and the corresponding position of the machine tool sleeve is also cleaned to avoid the iron filings on the mating surface affecting the accuracy and damage the machine tool.

6) Generally, the tool length is used for the tool length (in the case of the knife in the special case), the program order should be checked carefully.

7) When the program is interrupted or repaired, it is necessary to pay attention to whether the depth can be connected with the front. Under normal circumstances, the line can be adjusted upward by 0.1mm, and then adjusted according to the situation.

8) Rotating and removing the cutter head. If water-soluble cutting fluid is used, it should be immersed in lubricating oil for several hours every half month for maintenance, so that the internal parts of the cutter head can be lubricated without wear.

Precautions for correcting the alignment of the workpiece

1) When the workpiece is towed, you must pay attention to the verticality, while dragging, and then dragging the vertical edge.

2) When the workpiece is divided, it must be verified twice.

3) After the number of hits, the median size should be provided according to the program and the size on the parts map should be checked.

4) All workpieces must be divided into sub-centers. The zero position must be divided into the sub-centers and then moved to the side. It must be ensured that the balances on both sides are consistent. If a special case must be taken unilaterally, it must be confirmed by the production team before it can pass. After the unilateral number is taken, remember the radius of the rod in the compensation back.

5) The zero input of the workpiece center must be the same as the three-axis center of the workstation computer diagram.

Processing considerations

1) When the amount of the top surface of the workpiece is too large, use a large knife to manually remove the remaining amount, and remember not to be deep.

2) The most important processing is the first knife. If you carefully operate and check, you can know whether the tool length compensation, tool radius compensation, program, speed, etc. are wrong, to avoid damage to the workpiece, tool, and machine tool.

3) Trial the procedure as follows:

a) The height of the first point is up to 100mm, and it is correct to use the eye to feel it;

b) control “quick shift” to 25% and feed to 0%;

c) When the tool approaches (about 10mm) the working surface, the machine is suspended;

d) check the remaining stroke and the program is correct;

e) After turning on the power again, put one hand on the pause,, ready to stop at any time, and the other hand controls the feed speed;

f) When the tool is very close to the workpiece surface, it can be stopped again. The remaining stroke of the Z-axis must be checked.

g) After the machining is smooth and stable, return the control to the normal state.

4) After entering the program name, use the pen to copy the name of the program on the screen, and then check with the program. When opening the program, check whether the size of the tool in the program matches the program list, and sign the processor on the program. Fill in the file name and the size of the tool in the column, and do not fill it in afterward or beforehand.

5) In principle, the NC mechanic must not leave when the workpiece is roughed. If you need to change the knife or assist in adjusting other machine tools, you must ask other NC team members or check back regularly.

6) When doing medium light, the NC mechanic should pay special attention to the place where the opening is not open when the thickening is made to prevent the tool from hitting this area.

7) Program cutting. If the program breaks during processing and wastes too much time from the beginning, the team leader and the programmer should be notified to modify the program and cut off the part that has been done.

8) The program is abnormal. If the program has a different situation and is not sure, you can hang up to observe the process and then decide the next action.

9) The speed and speed provided by the programmer during the machining process can be adjusted by the NC mechanic as appropriate. However, special attention should be paid to the fact that small pieces of copper cannot be opened at a high speed to avoid loosening of the workpiece due to shock.

10) During the machining of the workpiece, the NC mechanic should check with the parts drawing to see if there is any abnormal condition. Once the two are found to be inconsistent, the team leader must be immediately shut down to check whether there is any error.

11) When using a tool with a length of more than 200mm, it is necessary to pay attention to the margin and the depth of the feed, the speed of the feed, etc., in order to avoid the knives, and the speed of the corner should be controlled.

12) The operator must be responsible for detecting the diameter of the tool on the program sheet. At the same time, the diameter of the test shall be recorded. If the tolerance is exceeded, it shall be immediately reported to the team leader or the tool change.

13) When the machine tool is in automatic operation or available, the operator should go to the workstation to learn about the remaining machining programming, prepare and grind the appropriate tool for the next machining standby to avoid downtime.

14) Process errors are the main reasons for wasting time: incorrect use of improper tools, processing errors, waste of time in locations where no machining or non-computer processing is required, improper use of machining conditions (slow speed, empty knife), the knife path is too dense, the feed is too slow, etc.), the above events can be contacted during programming.

15) During the machining process, attention must be paid to the wear of the tool. The blade or tool should be replaced appropriately. After replacing the blade, pay attention to whether the boundary of the machining is consistent.

Processing precautions

1) Confirm that each procedure and each instruction required by the procedure has been completed.

2) After the processing is completed, it is necessary to check whether the shape of the workpiece meets the requirements, and at the same time, the workpiece size self-test is performed according to the part drawing or the process drawing, and the error is found in time.

3) Check the position of the workpiece for any abnormality. If in doubt, notify the NC team leader.

4) The large group of workpieces must be notified to the team leader, programmer and production team leader.

5) Pay attention to safety when the workpiece is off the machine, especially when the workpiece is off the machine, the workpiece and the NC machine should be protected.

Ten years of mastering CNC machining experience collection!Just get it! 2

Different treatments of processing accuracy requirements

The surface quality of polished light:

1) mold core, insert

2) Tonggong

3) thimble plate support hole and other places to avoid vacancies

4) Eliminate the vibration of the knife

The size of the fine light:

1) Measurable size must be strictly performed after processing self-test

2) Consider the loss of the tool during long-term processing, especially the sealing position.

3) The fine light should use new cemented carbide tools as much as possible

4) Determine the modulus of the lens after finishing the light according to the processing requirements

5) Confirmation of quality after processing and quality

6) Control the tool loss during the processing of the sealant depending on the processing requirements

Hand over

1) Confirm the operation of the work, including the processing situation, mold conditions, etc.

2) Confirm that the working equipment of the shift is normal.

3) Other handovers and confirmations, including drawings, program sheets, tools, gauges, fixtures, etc.

Workplace finishing

1) Execute according to 5S requirements.

2) The tools, measuring tools, fixtures, workpieces, tools, etc. are placed neatly.

3) Cleaning of the machine tool.

4) Cleaning the workplace floor.

5) Returning the processed tool, idle tool and measuring tool.

6) The processed parts are sent to the product inspection or the corresponding department.

Leave a Reply

Your email address will not be published. Required fields are marked *

91精品久久综合熟女-日产精品毛片av一区二区三区-国产精品永久在线播放-一区二区中文字幕在线视频| 伊人久久大香线蕉综合av-久久久中文字幕人妻精品一区二区-青草在线免费观看视频-国产清纯白嫩美女蜜臀av| 在线视频自拍第九十七页-亚洲岛国精品视频在线观看-亚洲av日韩一区在线观看-日韩精品中文一区二区三区| 天天色天天干天天操天天射-日本午夜一区二区福利激情-国产精品一区中文字幕在线-欧美性生活网站视频观看| 一本大道加勒比东京热-国产一二三区亚洲精品美女-国产在线麻豆在拍91精品-久久久久成人亚洲国产| 国产精品99一区二区三区-伦理激情婷婷综合五月天-综合久久av一区二区三区-99精品国产在热久久| 国产亚洲一区二区三区综合片-亚洲天堂日韩精品在线-有码视频在线观看日本专区-亚洲精品成人福利在线| 狠狠久久五月综合色和啪-日韩精品欧美一区二区三区软件-亚洲女同精品一区二区久久-国产传媒在线视频免费观看| 五月婷婷六月色激情综合-国语对白在线免费视频-亚洲熟女熟妇乱色一区-深夜福利免费在线播放| 亚洲不卡视频一区二区三区-99久久精品国产成人综合-国内精品熟女亚洲精品熟女-亚洲日本成人在线观看高清| 午夜狂情三级伦理涩之屋-亚洲国产精品美女嫩模综合在-久热在线观看免费视频-国产精品伦子一区二区三区| 正在播放后入极品美少妇-亚洲一区二区三区自拍麻豆-国产亚洲精品成人久久-av老司机亚洲精品久久| 日韩精品中文字幕第二页-日本午夜剧场在线观看-毛片在线观看免费日韩-日韩午夜理论中文字幕毛片| 国内外成人综合免费视频-久久国产精品99久久蜜臀-大三美女口爆吞精视频-亚洲国产一区二区精品性色| 国产精品精品久久99-久久羞羞色院精品全部免费-日韩中文粉嫩一区二区三区-外国黄色三级视频网站| 午夜影视网站在线观看-欧美成年人性生活在线观看-好看的日韩电影一区二区三区-日本中文字幕在线在线| 18 禁国产一区二区三区无遮掩-男女国产猛烈无遮挡视频-国产精品一区二区三区在线蜜桃-色悠悠国产精品免费观看| 国产精品毛片一区二区三-av蜜臀永久免费看片-三级国产美女搭讪视频-亚洲中文字幕在线观看一区二区| 亚洲天堂av免费在线看-操老熟女中国老太自拍-夫妻性生生活免费视频-日韩av有码高清在线| 日韩三级一区二区三区高清-亚洲插入视频在线观看-91精品中文字幕一区二区三区-精品一区二区三区男人吃奶视频| 99久久亚洲综合精品成人网-国产性感丝袜在线观看-国产一区二区三区激情啪啪啪-久久香蕉综合国产蜜臀av| 开心五月激情五月综合-国产88精品久久久久久-乱人伦精品视频在线观看-秘社一区二区三区一午夜日本| 人妻少妇精品久久中文字幕-在线免费观看亚洲小视频-网友偷拍视频一区二区三区-亚洲国产精品日韩av在线| 九色蝌蚪国产极品自拍-国产夫妻自拍后入视频-国产一级黄色片在线观看-亚洲欧洲日产国产av| 亚洲老妈激情一区二区三区-夜晚福利视频亚洲精品自拍视频-亚洲av永久精品一区二区在线-中文国产人精品久久蜜桃| 亚洲av男人的天堂久久精品-人妻中文字幕一区二区视频-国产男女乱淫真视频播放-国内人妻自拍交换在线视频| 亚洲欧洲偷拍自拍av-日韩午夜福利剧场久久-午夜福利成人在线视频-91午夜福利在线观看精品| 日本av自拍偷拍视频-日韩精品人妻一区二区三区-看片福利国产午夜三级看片-在线观看视频最新信息好幫手| 亚洲精品中文综合第一页-91九色国产在线观看-小少妇特殊按摩高潮不止-沈阳老熟女多毛嗷嗷叫| 国产精品剧情一区在线观看-精品伊人久久大香线蕉-一起草视频在线播放观看-精品少妇人妻av一区二区蜜桃| 精品国产美女av天堂-狼人av在线免费观看-日韩精品人妻中文字幕有码在线-欧美视频亚洲视频自拍偷拍| 91久久国产综合蜜桃-深夜激情在线免费观看-免费观看国产在线视频不卡-天堂在线精品免费亚洲| 久久这里就有国产熟女精品-国产免费一级特黄录像-伊人久久热这里只有精品-国产三级一区二区三区在线观看| 国产丝袜在线精品丝袜不卡-精品一区二区三区爆白浆-在线不卡小视频播放网站-视频二区中文字幕在线播放| 能看免费欧美一级黄片-男女视频网站免费精品播放-日本高清在线一区二区三区-熟女少妇免费视频网站观看| 午夜中文字幕一区二区三区-亚洲精品av在线免费观看-蜜臀av一区二区三区久久bu-五月激情综合在线视频| 91九色精品人成在线观看-国产成人免费综合激情-新久久国产色av免费看-av网站国产主播在线| 日韩av观看一区二区三区四区-美丽的蜜桃3在线观看-久久人妻少妇嫩草av-欧美亚洲另类久久久精品| 91免费视频国产自拍-亚洲av 综合一区二区人妖-青青草草青青在线播放-欧美精品免费一区二区二区| 亚洲毛片在线观看视频网站-午夜高清福利在线观看-性生活视频在线免费观看-女人吞精口爆在线视频| 99热亚洲熟女少妇一区二区-久草福利免费在线视频观看-人妻丰满熟妇av一区二区-日韩高清亚洲一区二区|