色呦呦网址在线观看,久久久久久久久福利精品,国产欧美1区2区3区,国产日韩av一区二区在线

??? ????? ?? ????? ??? ????? ??????? ???????? ?????? ????? (??? ???? ????)

In the mold factory, the CNC machining center is mainly used for mold key parts such as mold cores and inserts, and copper and other processing. The quality of the mold and the insert directly determines the quality of the molded part of the mold. The quality of copper processing directly limits the impact of EDM processing. For the guarantee of CNC processing quality, the key lies in the preparation before processing. In addition to having rich processing experience and mold knowledge, we must pay attention to good communication, especially communication with the production team and colleagues.

CNC machining process

1) Reading drawings and procedures

2) Transfer the corresponding program to the machine

3) Check the program head, cutting parameters, etc.

4) Determination of process size and margin on the workpiece

5) Reasonable clamping of the workpiece

6) Accurate alignment of the workpiece

7) Accurate establishment of workpiece coordinates

8) Selection of reasonable tools and cutting parameters

9) Reasonable clamping of the tool

10) Safe trial cutting method

11) Observation of the processing process

12) Adjustment of cutting parameters

13) Problems in the process and timely feedback from the corresponding personnel

14) Detection of workpiece quality after machining

Precautions before processing

1) For the new model, the processing map should meet the requirements, and the data is clear; the processing map of the new model must have the signature of the supervisor, and the columns of the processing map are filled out.

2) The workpiece has a qualified mark for the quality department.

3) After receiving the program list, check whether the workpiece reference position is consistent with the drawing reference position.

4) Look at each requirement on the program sheet to confirm that the program and drawing requirements are consistent. If there is a problem, you must solve the problem together with the programmer and the production team.

5) According to the material of the workpiece and its size, judge the rationality of the tool used by the programmer to open the rough or light knife program.

If the tool is found to be unreasonable, the programmer should be notified immediately to make changes to improve machining efficiency and workpiece machining accuracy.

Precautions for clamping workpieces

1) When clamping the workpiece, pay attention to the position of the pallet and the extension length of the nut-bolt on the pressure plate. In addition, the screw cannot be bottomed when the angle is locked.

2) Tonggong is generally used for lock plate processing. Before the machine is installed, it should be checked against the number of materials on the program sheet. At the same time, check whether the closing screw is tightened.

3) For the case where a board receives multiple pieces of copper material, check whether the direction is correct and whether the copper materials interfere during processing.

4) According to the shape of the program sheet and the data of the workpiece size, it is necessary to note that the workpiece size data is written as XxYxZ. At the same time, if there is a piece map, the graphics of the program sheet and the figure of the parts drawing must be checked. Whether it is consistent, pay attention to which direction to go out, and the X, Y axis of the pendulum.

5) When clamping the workpiece, it is necessary to check whether the workpiece size meets the size requirements of the program sheet. If there is a part drawing, it is necessary to check whether the size of the program sheet is the same as the size of the parts drawing.

6) The workbench and the bottom of the workpiece should be cleaned before the workpiece is placed on the machine. Apply the oil stone on the machine table and the workpiece surface to push off the burrs and the damaged position.

7) When the code is coded, make sure the chip is not damaged by the knife and communicate with the programmer if necessary. At the same time, if the bottom pad is square, the code must be aligned with the square of the pad to achieve the purpose of force balance.

8) When using a vise clamp, you must know the depth of the tool to prevent it from being too long or too short.

9) Screws must be included in the T-shaped block. Do not use only a part of the thread. If the screw is to be connected, the upper and lower screws must use the thread of the half joint. The thread of the nut on the pressure plate must be completely used. Thread.

10) When determining the Z depth number, you should see the position of the program single touch number and the data of the highest point of Z. After inputting the data into the machine tool, you must check it again.

Precautions for clamping tools

1) It must be firmly clamped and not too short in the handle.

2) Before each shovel, check whether the tool meets the requirements. The length of the knives should be determined according to the machining depth indicated by the program. Generally, it should be slightly longer than the machining depth value of 2mm and the shank should be considered.

3) If you encounter a deep processing depth, you can communicate with the programmer. If you want to use the knife twice, you should first obtain half the length of 2/3, and then wait longer when you process to a deeper position. This can improve processing efficiency.

4) When using the extension cord, you should especially know the depth of the lower knife and the required length of the knife.

5) Before the cutter head is installed on the machine, its taper fit position is cleaned with a cleaning cloth, and the corresponding position of the machine tool sleeve is also cleaned to avoid the iron filings on the mating surface affecting the accuracy and damage the machine tool.

6) Generally, the tool length is used for the tool length (in the case of the knife in the special case), the program order should be checked carefully.

7) When the program is interrupted or repaired, it is necessary to pay attention to whether the depth can be connected with the front. Under normal circumstances, the line can be adjusted upward by 0.1mm, and then adjusted according to the situation.

8) Rotating and removing the cutter head. If water-soluble cutting fluid is used, it should be immersed in lubricating oil for several hours every half month for maintenance, so that the internal parts of the cutter head can be lubricated without wear.

Precautions for correcting the alignment of the workpiece

1) When the workpiece is towed, you must pay attention to the verticality, while dragging, and then dragging the vertical edge.

2) When the workpiece is divided, it must be verified twice.

3) After the number of hits, the median size should be provided according to the program and the size on the parts map should be checked.

4) All workpieces must be divided into sub-centers. The zero position must be divided into the sub-centers and then moved to the side. It must be ensured that the balances on both sides are consistent. If a special case must be taken unilaterally, it must be confirmed by the production team before it can pass. After the unilateral number is taken, remember the radius of the rod in the compensation back.

5) The zero input of the workpiece center must be the same as the three-axis center of the workstation computer diagram.

Processing considerations

1) When the amount of the top surface of the workpiece is too large, use a large knife to manually remove the remaining amount, and remember not to be deep.

2) The most important processing is the first knife. If you carefully operate and check, you can know whether the tool length compensation, tool radius compensation, program, speed, etc. are wrong, to avoid damage to the workpiece, tool, and machine tool.

3) Trial the procedure as follows:

a) The height of the first point is up to 100mm, and it is correct to use the eye to feel it;

b) control “quick shift” to 25% and feed to 0%;

c) When the tool approaches (about 10mm) the working surface, the machine is suspended;

d) check the remaining stroke and the program is correct;

e) After turning on the power again, put one hand on the pause,, ready to stop at any time, and the other hand controls the feed speed;

f) When the tool is very close to the workpiece surface, it can be stopped again. The remaining stroke of the Z-axis must be checked.

g) After the machining is smooth and stable, return the control to the normal state.

4) After entering the program name, use the pen to copy the name of the program on the screen, and then check with the program. When opening the program, check whether the size of the tool in the program matches the program list, and sign the processor on the program. Fill in the file name and the size of the tool in the column, and do not fill it in afterward or beforehand.

5) In principle, the NC mechanic must not leave when the workpiece is roughed. If you need to change the knife or assist in adjusting other machine tools, you must ask other NC team members or check back regularly.

6) When doing medium light, the NC mechanic should pay special attention to the place where the opening is not open when the thickening is made to prevent the tool from hitting this area.

7) Program cutting. If the program breaks during processing and wastes too much time from the beginning, the team leader and the programmer should be notified to modify the program and cut off the part that has been done.

8) The program is abnormal. If the program has a different situation and is not sure, you can hang up to observe the process and then decide the next action.

9) The speed and speed provided by the programmer during the machining process can be adjusted by the NC mechanic as appropriate. However, special attention should be paid to the fact that small pieces of copper cannot be opened at a high speed to avoid loosening of the workpiece due to shock.

10) During the machining of the workpiece, the NC mechanic should check with the parts drawing to see if there is any abnormal condition. Once the two are found to be inconsistent, the team leader must be immediately shut down to check whether there is any error.

11) When using a tool with a length of more than 200mm, it is necessary to pay attention to the margin and the depth of the feed, the speed of the feed, etc., in order to avoid the knives, and the speed of the corner should be controlled.

12) The operator must be responsible for detecting the diameter of the tool on the program sheet. At the same time, the diameter of the test shall be recorded. If the tolerance is exceeded, it shall be immediately reported to the team leader or the tool change.

13) When the machine tool is in automatic operation or available, the operator should go to the workstation to learn about the remaining machining programming, prepare and grind the appropriate tool for the next machining standby to avoid downtime.

14) Process errors are the main reasons for wasting time: incorrect use of improper tools, processing errors, waste of time in locations where no machining or non-computer processing is required, improper use of machining conditions (slow speed, empty knife), the knife path is too dense, the feed is too slow, etc.), the above events can be contacted during programming.

15) During the machining process, attention must be paid to the wear of the tool. The blade or tool should be replaced appropriately. After replacing the blade, pay attention to whether the boundary of the machining is consistent.

Processing precautions

1) Confirm that each procedure and each instruction required by the procedure has been completed.

2) After the processing is completed, it is necessary to check whether the shape of the workpiece meets the requirements, and at the same time, the workpiece size self-test is performed according to the part drawing or the process drawing, and the error is found in time.

3) Check the position of the workpiece for any abnormality. If in doubt, notify the NC team leader.

4) The large group of workpieces must be notified to the team leader, programmer and production team leader.

5) Pay attention to safety when the workpiece is off the machine, especially when the workpiece is off the machine, the workpiece and the NC machine should be protected.

Ten years of mastering CNC machining experience collection!Just get it! 2

Different treatments of processing accuracy requirements

The surface quality of polished light:

1) mold core, insert

2) Tonggong

3) thimble plate support hole and other places to avoid vacancies

4) Eliminate the vibration of the knife

The size of the fine light:

1) Measurable size must be strictly performed after processing self-test

2) Consider the loss of the tool during long-term processing, especially the sealing position.

3) The fine light should use new cemented carbide tools as much as possible

4) Determine the modulus of the lens after finishing the light according to the processing requirements

5) Confirmation of quality after processing and quality

6) Control the tool loss during the processing of the sealant depending on the processing requirements

Hand over

1) Confirm the operation of the work, including the processing situation, mold conditions, etc.

2) Confirm that the working equipment of the shift is normal.

3) Other handovers and confirmations, including drawings, program sheets, tools, gauges, fixtures, etc.

Workplace finishing

1) Execute according to 5S requirements.

2) The tools, measuring tools, fixtures, workpieces, tools, etc. are placed neatly.

3) Cleaning of the machine tool.

4) Cleaning the workplace floor.

5) Returning the processed tool, idle tool and measuring tool.

6) The processed parts are sent to the product inspection or the corresponding department.

???? ???????

?? ??? ??? ????? ????? ??????????. ?????? ????????? ???? ????? ?? *

欧洲亚洲高清另类清纯-国产av一区二区三区av-亚洲精品一区二区三区午夜-国产夫妻自拍3p视频在线| 日韩在线免费av网站-免费啪视频一区二区三区在线观看-久操热在线视频免费观看-91亚洲国产成人精品性色| 精品人妻中文字幕有码在线-亚洲欧美一区二区成人精品久久久-亚洲第一人伊狼人久久-亚洲国产欧美精品在线观看| 亚洲a级一区二区三区-人妻中文字幕精品在线-日韩精品中文字幕人妻系列-香蕉久久最新精品视频| 日韩国产自拍在线视频-亚洲av午夜激情在线播放-午夜福利你懂的在线观看-少妇特殊按摩高潮惨叫| 成人午夜在线免费播放-97精品在线观看免费-亚洲av一级片在线观看-国产原创自拍看在线视频| 国产深夜视频在线观看-丰满人妻熟妇乱又乱精品-青草视频在线观看资源-奇米网东京热日本人妻| 国产精品羞羞答答色哟哟-最新麻豆精品在线视频-丰满多毛熟妇的大阴户-精品国产乱子伦一区二区三女| 人人澡人人妻人人干-亚洲中国麻豆美女av-日本淫妇一区二区三区-美女午夜福利偷偷要网站| 亚洲一区二区三区日本久久-精品国产成人一区二区不卡在线-91精品国产色综合久久成人-一区二区三区成人在线观看| 亚洲av成人午夜福利在线观看-日韩精品成人影院久久久-国产在线高清不卡一区-激情五月另类综合视频| 成年人午夜黄片视频资源-少妇高潮喷水在线观看-色网最新地址在线观看-人人爽人人澡人人人人妻那u还没| 亚洲av成人午夜福利在线观看-日韩精品成人影院久久久-国产在线高清不卡一区-激情五月另类综合视频| 成人午夜伦理在线观看-国产一级做a爰片久久-亚洲精品av一区二区三区-国产色区一区二区三区| 日韩97精品一区二区三区-九九日本黄色精品视频-一进一出流出白浆视频-国产亚洲精品不卡视频| 国产深夜视频在线观看-丰满人妻熟妇乱又乱精品-青草视频在线观看资源-奇米网东京热日本人妻| 九九在线国产精品自拍-亚洲综合精品中文字幕-亚州国产成人综合精品-人妻少妇久久精品中文| 尤物国产精品福利在线网-中日韩一二三级黄色永久视频-加勒比av免费在线播放-91欧美精品一区二区三区| 色男人天堂综合久久av-蜜桃精品一区二区三区蜜桃臀-国产粉嫩高中生第一次不戴套-成人激情自拍视频在线观看| 欧美精品日韩精品在线-久热传媒在线免费观看视频-亚洲一级天堂作爱av-久久精品国产精品亚洲蜜月| 亚洲国产高清在线一区二区三区-最近免费视频观看在线播放-中出内射视频在线播放-97碰碰日本乱偷人妻禁片| 精品视频在线观看免费一区二区-哪里可以看国产视频一区二区三区-亚洲天堂av在线免费观看-国产大片网站在线观看| 特大毛片毛片免费视频-成人伊人青草久久综合网-91亚洲蜜桃内射后入在线观看-日韩情色电影中文字幕| 日本免费久久精品视频-毛很浓密很多黑毛熟女-97这里只有精品在线-亚洲乱码国产乱码精品精| 亚洲欧美成人影院网址-在线观看视频一区二区三区三州-成人自拍视频免费在线-国产精品蜜臀视频视频| 亚洲乱码日产精品一二三-日韩中文字幕综合在线-日韩欧美一级黄色录像-午夜福利在线视频观看| 日韩黄片av在线免费观看-久久精品国产亚洲av色哟哟-亚洲第一中文字幕少妇-91久久精品国产性色tv| 亚洲精品色国语对白在线-黄片毛片av在线免费观看-久久精品有码av天堂-日韩一区二区三区高清视频| 午夜性色福利在线视频福利-久久精品视频免费获取地址-亚洲一区二区三区在线观看不卡-无套进入美女免费观看视频| 亚洲女人性开放视频免费-亚洲婷婷精品久久久久-亚洲中字字幕中文乱码-韩日av不卡一区二区三区| 日韩有色视频在线观看-久久亚洲精品一区二区三区-风韵犹存久久一区二区三区-日本最黄网站在线观看| 四虎最新在线观看视频-水蜜桃一二二视频在线观看免费-一区二区精品在线观看视频-成人高清在线播放视频| 男人天堂色男人色偷偷-国产内射在线干得爽到语无次-国产成人亚洲欧美二区综合-精品欧美高清视频观看| 开心五月激情五月综合-国产88精品久久久久久-乱人伦精品视频在线观看-秘社一区二区三区一午夜日本| 欧美精品日韩精品在线-久热传媒在线免费观看视频-亚洲一级天堂作爱av-久久精品国产精品亚洲蜜月| 日本一区二区三区高清视频-九九九热在线观看视频-亚洲综合自拍偷拍人妻丝袜-亚洲精品国产二区三区在线| 亚洲综合精品一区二区在线-国产亚洲精品视频在线播放-国产精品经典三级免费观看-五月婷婷六月丁香视频| 精品人妻一区二区三区四区石在线-国产精品国产三级国产三级人妇-午夜激情精品在线观看-一本久道视频蜜臀视频| 在线视频自拍第九十七页-亚洲岛国精品视频在线观看-亚洲av日韩一区在线观看-日韩精品中文一区二区三区| 午夜精品福利激情视频-婷婷国产五月天网久久精品-国产av麻豆嫩草视频-av日本中文字幕在线| 黄片毛片av免费观看-四虎国产精品久久免费地址-精品午夜一区二区三区国产av-亚洲成a人一区二区三区久久|