In the mold factory, the CNC machining center is mainly used for mold key parts such as mold cores and inserts, and copper and other processing. The quality of the mold and the insert directly determines the quality of the molded part of the mold. The quality of copper processing directly limits the impact of EDM processing. For the guarantee of CNC processing quality, the key lies in the preparation before processing. In addition to having rich processing experience and mold knowledge, we must pay attention to good communication, especially communication with the production team and colleagues.

CNC machining process

1) Reading drawings and procedures

2) Transfer the corresponding program to the machine

3) Check the program head, cutting parameters, etc.

4) Determination of process size and margin on the workpiece

5) Reasonable clamping of the workpiece

6) Accurate alignment of the workpiece

7) Accurate establishment of workpiece coordinates

8) Selection of reasonable tools and cutting parameters

9) Reasonable clamping of the tool

10) Safe trial cutting method

11) Observation of the processing process

12) Adjustment of cutting parameters

13) Problems in the process and timely feedback from the corresponding personnel

14) Detection of workpiece quality after machining

Precautions before processing

1) For the new model, the processing map should meet the requirements, and the data is clear; the processing map of the new model must have the signature of the supervisor, and the columns of the processing map are filled out.

2) The workpiece has a qualified mark for the quality department.

3) After receiving the program list, check whether the workpiece reference position is consistent with the drawing reference position.

4) Look at each requirement on the program sheet to confirm that the program and drawing requirements are consistent. If there is a problem, you must solve the problem together with the programmer and the production team.

5) According to the material of the workpiece and its size, judge the rationality of the tool used by the programmer to open the rough or light knife program.

If the tool is found to be unreasonable, the programmer should be notified immediately to make changes to improve machining efficiency and workpiece machining accuracy.

Precautions for clamping workpieces

1) When clamping the workpiece, pay attention to the position of the pallet and the extension length of the nut-bolt on the pressure plate. In addition, the screw cannot be bottomed when the angle is locked.

2) Tonggong is generally used for lock plate processing. Before the machine is installed, it should be checked against the number of materials on the program sheet. At the same time, check whether the closing screw is tightened.

3) For the case where a board receives multiple pieces of copper material, check whether the direction is correct and whether the copper materials interfere during processing.

4) According to the shape of the program sheet and the data of the workpiece size, it is necessary to note that the workpiece size data is written as XxYxZ. At the same time, if there is a piece map, the graphics of the program sheet and the figure of the parts drawing must be checked. Whether it is consistent, pay attention to which direction to go out, and the X, Y axis of the pendulum.

5) When clamping the workpiece, it is necessary to check whether the workpiece size meets the size requirements of the program sheet. If there is a part drawing, it is necessary to check whether the size of the program sheet is the same as the size of the parts drawing.

6) The workbench and the bottom of the workpiece should be cleaned before the workpiece is placed on the machine. Apply the oil stone on the machine table and the workpiece surface to push off the burrs and the damaged position.

7) When the code is coded, make sure the chip is not damaged by the knife and communicate with the programmer if necessary. At the same time, if the bottom pad is square, the code must be aligned with the square of the pad to achieve the purpose of force balance.

8) When using a vise clamp, you must know the depth of the tool to prevent it from being too long or too short.

9) Screws must be included in the T-shaped block. Do not use only a part of the thread. If the screw is to be connected, the upper and lower screws must use the thread of the half joint. The thread of the nut on the pressure plate must be completely used. Thread.

10) When determining the Z depth number, you should see the position of the program single touch number and the data of the highest point of Z. After inputting the data into the machine tool, you must check it again.

Precautions for clamping tools

1) It must be firmly clamped and not too short in the handle.

2) Before each shovel, check whether the tool meets the requirements. The length of the knives should be determined according to the machining depth indicated by the program. Generally, it should be slightly longer than the machining depth value of 2mm and the shank should be considered.

3) If you encounter a deep processing depth, you can communicate with the programmer. If you want to use the knife twice, you should first obtain half the length of 2/3, and then wait longer when you process to a deeper position. This can improve processing efficiency.

4) When using the extension cord, you should especially know the depth of the lower knife and the required length of the knife.

5) Before the cutter head is installed on the machine, its taper fit position is cleaned with a cleaning cloth, and the corresponding position of the machine tool sleeve is also cleaned to avoid the iron filings on the mating surface affecting the accuracy and damage the machine tool.

6) Generally, the tool length is used for the tool length (in the case of the knife in the special case), the program order should be checked carefully.

7) When the program is interrupted or repaired, it is necessary to pay attention to whether the depth can be connected with the front. Under normal circumstances, the line can be adjusted upward by 0.1mm, and then adjusted according to the situation.

8) Rotating and removing the cutter head. If water-soluble cutting fluid is used, it should be immersed in lubricating oil for several hours every half month for maintenance, so that the internal parts of the cutter head can be lubricated without wear.

Precautions for correcting the alignment of the workpiece

1) When the workpiece is towed, you must pay attention to the verticality, while dragging, and then dragging the vertical edge.

2) When the workpiece is divided, it must be verified twice.

3) After the number of hits, the median size should be provided according to the program and the size on the parts map should be checked.

4) All workpieces must be divided into sub-centers. The zero position must be divided into the sub-centers and then moved to the side. It must be ensured that the balances on both sides are consistent. If a special case must be taken unilaterally, it must be confirmed by the production team before it can pass. After the unilateral number is taken, remember the radius of the rod in the compensation back.

5) The zero input of the workpiece center must be the same as the three-axis center of the workstation computer diagram.

Processing considerations

1) When the amount of the top surface of the workpiece is too large, use a large knife to manually remove the remaining amount, and remember not to be deep.

2) The most important processing is the first knife. If you carefully operate and check, you can know whether the tool length compensation, tool radius compensation, program, speed, etc. are wrong, to avoid damage to the workpiece, tool, and machine tool.

3) Trial the procedure as follows:

a) The height of the first point is up to 100mm, and it is correct to use the eye to feel it;

b) control “quick shift” to 25% and feed to 0%;

c) When the tool approaches (about 10mm) the working surface, the machine is suspended;

d) check the remaining stroke and the program is correct;

e) After turning on the power again, put one hand on the pause,, ready to stop at any time, and the other hand controls the feed speed;

f) When the tool is very close to the workpiece surface, it can be stopped again. The remaining stroke of the Z-axis must be checked.

g) After the machining is smooth and stable, return the control to the normal state.

4) After entering the program name, use the pen to copy the name of the program on the screen, and then check with the program. When opening the program, check whether the size of the tool in the program matches the program list, and sign the processor on the program. Fill in the file name and the size of the tool in the column, and do not fill it in afterward or beforehand.

5) In principle, the NC mechanic must not leave when the workpiece is roughed. If you need to change the knife or assist in adjusting other machine tools, you must ask other NC team members or check back regularly.

6) When doing medium light, the NC mechanic should pay special attention to the place where the opening is not open when the thickening is made to prevent the tool from hitting this area.

7) Program cutting. If the program breaks during processing and wastes too much time from the beginning, the team leader and the programmer should be notified to modify the program and cut off the part that has been done.

8) The program is abnormal. If the program has a different situation and is not sure, you can hang up to observe the process and then decide the next action.

9) The speed and speed provided by the programmer during the machining process can be adjusted by the NC mechanic as appropriate. However, special attention should be paid to the fact that small pieces of copper cannot be opened at a high speed to avoid loosening of the workpiece due to shock.

10) During the machining of the workpiece, the NC mechanic should check with the parts drawing to see if there is any abnormal condition. Once the two are found to be inconsistent, the team leader must be immediately shut down to check whether there is any error.

11) When using a tool with a length of more than 200mm, it is necessary to pay attention to the margin and the depth of the feed, the speed of the feed, etc., in order to avoid the knives, and the speed of the corner should be controlled.

12) The operator must be responsible for detecting the diameter of the tool on the program sheet. At the same time, the diameter of the test shall be recorded. If the tolerance is exceeded, it shall be immediately reported to the team leader or the tool change.

13) When the machine tool is in automatic operation or available, the operator should go to the workstation to learn about the remaining machining programming, prepare and grind the appropriate tool for the next machining standby to avoid downtime.

14) Process errors are the main reasons for wasting time: incorrect use of improper tools, processing errors, waste of time in locations where no machining or non-computer processing is required, improper use of machining conditions (slow speed, empty knife), the knife path is too dense, the feed is too slow, etc.), the above events can be contacted during programming.

15) During the machining process, attention must be paid to the wear of the tool. The blade or tool should be replaced appropriately. After replacing the blade, pay attention to whether the boundary of the machining is consistent.

Processing precautions

1) Confirm that each procedure and each instruction required by the procedure has been completed.

2) After the processing is completed, it is necessary to check whether the shape of the workpiece meets the requirements, and at the same time, the workpiece size self-test is performed according to the part drawing or the process drawing, and the error is found in time.

3) Check the position of the workpiece for any abnormality. If in doubt, notify the NC team leader.

4) The large group of workpieces must be notified to the team leader, programmer and production team leader.

5) Pay attention to safety when the workpiece is off the machine, especially when the workpiece is off the machine, the workpiece and the NC machine should be protected.

Ten years of mastering CNC machining experience collection!Just get it! 2

Different treatments of processing accuracy requirements

The surface quality of polished light:

1) mold core, insert

2) Tonggong

3) thimble plate support hole and other places to avoid vacancies

4) Eliminate the vibration of the knife

The size of the fine light:

1) Measurable size must be strictly performed after processing self-test

2) Consider the loss of the tool during long-term processing, especially the sealing position.

3) The fine light should use new cemented carbide tools as much as possible

4) Determine the modulus of the lens after finishing the light according to the processing requirements

5) Confirmation of quality after processing and quality

6) Control the tool loss during the processing of the sealant depending on the processing requirements

Hand over

1) Confirm the operation of the work, including the processing situation, mold conditions, etc.

2) Confirm that the working equipment of the shift is normal.

3) Other handovers and confirmations, including drawings, program sheets, tools, gauges, fixtures, etc.

Workplace finishing

1) Execute according to 5S requirements.

2) The tools, measuring tools, fixtures, workpieces, tools, etc. are placed neatly.

3) Cleaning of the machine tool.

4) Cleaning the workplace floor.

5) Returning the processed tool, idle tool and measuring tool.

6) The processed parts are sent to the product inspection or the corresponding department.

???? ???????

?? ??? ??? ????? ????? ??????????. ?????? ????????? ???? ????? ?? *

人人玩精品人妻丰满少妇-亚洲综合一区二区三区四区五区-亚洲av日韩av偷拍-亚洲欧美日韩一本一二| 91大神麻豆精品在线-熟女av综合一区二区三区-在线播放亚洲国产一区二区三-亚洲精品日韩在线丰满| 日韩97精品一区二区三区-九九日本黄色精品视频-一进一出流出白浆视频-国产亚洲精品不卡视频| 亚洲天堂av资源在线-四虎永久免费在线观看国产-久久这里只有精品人妻-欧美黄色三级经典精品| 狠狠操夜夜操天天干天天-午夜一级视频在线免费观看-我要看欧美一级黄色录像-91嫩草国产亚洲精品| 亚洲欧洲偷拍自拍av-日韩午夜福利剧场久久-午夜福利成人在线视频-91午夜福利在线观看精品| 日本女同免费在线观看-在线视频成人国产自拍-日韩av在线观看大全-后入翘臀剧情片在线看| 自拍偷在线精品自拍偷99九色-国产在线日韩欧美91-成人性生交大片免费看r链接-黄色日本黄色日本韩国黄色| 国产精品一区二区蜜桃视频-四十路五十路熟女丰满av-成人av天堂中文在线-亚洲精品成人国产在线| 国产午夜视频在线观看720p-成人深夜福利av在线-一区二区日韩精品教师学生-亚洲一区二区三区美臀在线播放| 99久久精品视频在线-日韩精品免费完整版视频-精品久久久久久久亚洲婷婷综合-久久精品国产亚州av| 欧美国产日本韩国一区二区-麻豆天美东精91厂制片-亚洲成人自拍视频在线观看-娇妻互换享受高潮91九色| 91精品在线播放黑丝-在线观看精品国产自拍-av免费在线播放日韩-日韩av在线精品一区二区三区| 国产精品一区二区久久人人爽-精品人妻一区二区三区有码-亚洲一二三区精品与老人-久久久之精品久久久| 蜜臀精品国产亚洲av尤物-日韩人妻少妇中文字幕-赶碰97在线公开视频-亚洲欧美日韩天堂综合| 四十如虎的丰满熟妇啪啪-国产三级电影在线免费看-国产综合色香蕉精品五夜婷-免费观看日韩三级视频| 四虎永久在线精品免费青青-久久久久久久 国内精品-国产精品四虎永久免费视频-男人天堂av免费观看| 国产好大好硬好爽好湿免费视频-国产精品一区二区精品一区二区-白白色发布在线播放国产-99久久国产精品成人观看| 国产免费午夜精品福利视频-久热99精品免费视频-久久久免费精品国产色夜-亚洲黄色不卡在线观看| 亚洲乱码中文字幕小综合-欧美亚洲国产精品一区二区-中文字幕人妻系列人妻有码中文-一区二区三区在线观看的视频| 午夜性福福利视频一区二区三区-午夜福利在线看片在线-欧洲内射免费人文艺术-亚洲天堂成人av在线| 极品尤物视频在线观看-亚洲成人av在线蜜桃-美国一级黄色免费网站-免费观看四虎国产精品| 午夜精品人妻一区二区三区-亚洲精品成人久久av-成人亚洲av精品入口-高清传媒视频在线观看| 免费十八禁一区二区三区-国产精品一区二区三区99-在线一区二区三区男男视频观看-精品欧美一区二区三区人妖| 国产精品自拍射精视频-蜜桃视频在线中文字幕-黑人泄欲一区二区三区-国内少妇无套内射精品视频| 一本色道亚州综合久久精品-91麻豆国产专区在线观看-一级二级三级国产视频-熟女av天堂免费高清| 久久精品国产久精国产爱-久久超碰97中文字幕-久热这里只有精品视频一区-日韩av在线免费观看| 中国美女欧美熟妇视频-五月爱婷婷丁香六月色-国产特黄特色成年女人毛片免-人妻精品一区二区三区久久| 亚洲国产高清在线一区二区三区-最近免费视频观看在线播放-中出内射视频在线播放-97碰碰日本乱偷人妻禁片| 久久都是精品久久都是精品-精国精品一区二区成人-亚洲品质自拍在线观看-中文 字幕乱码高清视频| 日本岛国三级黄色录像-日韩久久成人免费电影-中文字幕日韩专区一区二区-国产成人大片在线播放| 男女激情四射午夜福利视频网站-人成午夜免费毛片直接观看-日本女优在线观看一区二区-青草国内精品视频在线观看| 日本道二区二区视频-精品熟女视频一区二区三区国产-国产地区国产地区视频91-亚洲欧洲日产国码综合在线| 国产精品国产一区日韩一区-老色99久久九九爱精品-国产亚洲精品福利一区-亚洲av乱码av一区二区三区| 亚洲毛片在线观看视频网站-午夜高清福利在线观看-性生活视频在线免费观看-女人吞精口爆在线视频| 亚洲激情文学国产激情-一本色道久久综合亚洲精品高-国产精品高清在线播放-九九热视频在线观看精品| 99热久久热在线视频-久久精品国产亚洲av成人男男-国产精品日韩精品久久99-中文字幕在线日本乱码| av天堂免费中文在线-91麻豆国产综合精品久久-日韩av在线播放高清-台湾佬自偷自拍情侣在线| 国产精品熟女露脸对白-欲求不满中文字幕在线-日本一区二区三区的免费视频观看-激情久久av一区二区三区四区| 亚洲美脚一区二区三区-亚洲一区二区三区在线激情-国产精品日韩精品在线-丰满少妇高潮在线观看| 18禁无遮挡美女国产-久久精品国产精品亚洲毛片-国内精品极品在线视频看看-日本二区 欧美 亚洲 国产|